Optimization of Construction Project Scheduling using Metaheuristic Algorithms

Authors

  • Anubha Sahu, Mrs. Ragini Mishra

Keywords:

optimization; construction time; scheduling; reliability; random term extension factors; project interruptions; evolutionary modelling

Abstract

A new approach for resource scheduling using genetic algorithms (GAs) is presented here. The methodology depend on any set of heuristic rules. Instead, its strength lies in the selection and recombination tasks of the GA to learn the domain of the specific project network. By this it is able to evolve improved schedules with respect to the objective function. Further, the model is general enough to encompass both resource leveling and limited resource allocation problems unlike existing methods, which are class-dependent. In this paper, the design and mechanisms of the model are described. Case studies with standard test problems are presented to demonstrate the performance of the GA-scheduler when compared against heuristic methods under various resource availability profiles. Results obtained with the proposed model indicate an exponential batter result in the computational time required for larger problems.

References

Cheng, M. Y., & Sholeh, M. N. (2025). Artificial satellite search: A new metaheuristic algorithm for optimizing truss structure design and project scheduling. Applied Mathematical Modelling, 143, 116008.

Vahidi, J., & Golmaei, S. M. (2025). Optimizing Construction Scheduling Using the Sine Cosine Algorithm (SCA) with Building Information Modeling (BIM). Results in Engineering, 107100.

You, S. S., Cuong, T. N., & Kim, H. S. (2025). Optimizing quay crane scheduling using deep reinforcement learning with hybrid metaheuristic algorithm. Engineering Applications of Artificial Intelligence, 143, 110021.

Rajabi, R., & Yakhchali, S. H. (2025). Optimizing cash flow in construction portfolios: A metaheuristic approach from the organization’s perspective. Ain Shams Engineering Journal, 16(2), 103259.

Hu, Z., Wang, F., & Tang, Y. (2025). Cost optimization of repetitive project scheduling through a constraint programming-based relax-and-solve algorithm. Automation in Construction, 176, 106272.

Wang, W. C., Tian, W. C., Zang, H., & Zhang, X. T. (2025). Comprehensive Performance Assessment of State-of-the-Art Metaheuristic Algorithms for Multi-Scenario Reservoir Flood Control Optimization. Results in Engineering, 107132.

Liu, C. Y., & Chou, J. S. (2025). Automated legal consulting in construction procurement using metaheuristically optimized large language models. Automation in Construction, 170, 105891.

Azizi, M., Shishehgarkhaneh, M. B., Basiri, M., Moehler, R. C., Fang, Y., & Chan, M. (2025). Wolf-Bird Optimizer (WBO): A novel metaheuristic algorithm for Building Information Modeling-based resource tradeoff. Journal of Engineering Research, 13(2), 763-785.

Li, Y., Wu, J., Hao, Y., Gao, Y., Chai, R., Chai, S., & Zhang, B. (2024). Process scheduling for prefabricated construction based on multi-objective optimization algorithm. Automation in Construction, 168, 105809.

Shishehgarkhaneh, M. B., Basiri, M., & Azizi, M. (2024). Whale Optimization Algorithm (WOA) for BIM-based resource trade-off in construction project scheduling. In Handbook of Whale Optimization Algorithm (pp. 329-346). Academic Press.

Tomczak, M., & Jaśkowski, P. (2024). Customized particle swarm optimization for harmonizing multi-section construction projects. Automation in Construction, 162, 105359.

Taghaddos, M., Mousaei, A., Taghaddos, H., Hermann, U., Mohamed, Y., & AbouRizk, S. (2024). Optimized variable resource allocation framework for scheduling of fast-track industrial construction projects. Automation in Construction, 158, 105208.

Toaza, B., & Esztergár-Kiss, D. (2023). A review of metaheuristic algorithms for solving TSP-based scheduling optimization problems. Applied Soft Computing, 148, 110908.

Wang, J., Liu, H., & Wang, Z. (2023). Stochastic project scheduling optimization for multi-stage prefabricated building construction with reliability application. KSCE Journal of Civil Engineering, 27(6), 2356-2371.

Peiris, A., Hui, F. K. P., Duffield, C., & Ngo, T. (2023). Production scheduling in modular construction: Metaheuristics and future directions. Automation in Construction, 150, 104851.

Downloads

How to Cite

Anubha Sahu, Mrs. Ragini Mishra. (2026). Optimization of Construction Project Scheduling using Metaheuristic Algorithms. International Journal of Engineering Science & Humanities, 16(1), 32–46. Retrieved from https://www.ijesh.com/j/article/view/504