A Heuristic Approach to Optimize Rental Costs in a No-Idle Two-Stage Flow Shop Scheduling Problem

Authors

  • Dr. Sudesh Rathee

Keywords:

Flow shop, setup time, no-idle constraint, optimal sequencing, scheduling optimization, rental cost minimization

Abstract

Scheduling is an important issue for maximizing resource utilization in manufacturing. This paper deals with the no-idle two-stage flow shop scheduling problem (FSSP), from the view point of minimizing the total rental costs. The no-idle constraint, which requires continuous machine operation, is a very important constraint in real-world manufacturing systems. While classical algorithms like Johnson's Algorithm and NEH heuristic have been widely used, they usually do not take into account the optimization of the rental costs under no-idle constraints. To fill this gap, a new heuristic algorithm for finding optimum job sequence in terms of total elapsed time and total rental cost is proposed. The resulting model incorporates setup times, probabilistic processing time and job weightage to improve scheduling efficiency. A mathematical model of the problem is given, and the computational experiments were carried out for different sizes of jobs. The performance of the proposed method is compared with the well-known heuristics such as Johnson's Algorithm, Palmer's Heuristic, NEH, and Nailwal's heuristic. Experimental findings reveal that the proposed heuristic consistently outperforms conventional methods, yielding lower rental costs and improved machine utilization efficiency.

References

Adiri, I. and Pohoryles, D. (1982). Flow shop no-idle or no-wait scheduling to minimize the sum of completion times. Naval Research Logistics, 29(3), 495–504.

Allahverdi, A., Gupta, J. N. D., & Aldowaisan, T. (1999). A review of scheduling research involving setup considerations. Omega, Int. J. Mgmt Sci., 27(2), 219–239. https://doi.org/10.1016/S0305-0483(98)00042-5

Campbell, H. G., Dudek, R. A., & Smith, M. L. (1970). A heuristic algorithm for the n job, m machine sequencing problem. Management Science, 16(10), B630–B637.

Gupta, D., Goel, R., & Kaur, H. (2021). Optimizing rental cost with no idle constraints in two machines with weightage. Materials Today: Proceedings. https://doi.org/10.1016/j.matpr.2021.01.090

Gupta D., Shashi B., S. S. (2012). To Minimize The Rental Cost For 3- Stage Specially Structured Flow Shop Scheduling with Job Weightage. International Journal of Engineering Research and Applications (IJERA), 2(3), 912–916.

Downloads

How to Cite

Dr. Sudesh Rathee. (2025). A Heuristic Approach to Optimize Rental Costs in a No-Idle Two-Stage Flow Shop Scheduling Problem. International Journal of Engineering Science & Humanities, 15(1), 202–208. Retrieved from https://www.ijesh.com/j/article/view/497