Dr. Sudesh Rathee (2025) “A Heuristic Approach to Optimize Rental Costs in a No-Idle Two-Stage Flow Shop Scheduling Problem”, International Journal of Engineering Science & Humanities, 15(1), pp. 202–208. Available at: https://www.ijesh.com/j/article/view/497 (Accessed: 13 September 2026).